Chopping Up The Boardr Ledge Blog Post at The Boardr

The Boardr Logo

Chopping Up The Boardr Ledge

Published 8/7/2020 by Rob Meronek

This ledge was the first thing we put in our warehouse back in 2014. Today we hacked it up to change things up a bit.

Photos

Hacking up The Boardr Ledge - Idea

How do you take out a slab, flip it around, and get it against a wall that's a few feet away? Here's Justin's idea.

Hacking up The Boardr Ledge - Idea Looks Good

Looks good.

Hacking up The Boardr Ledge - Truck Jack

The truck jack was used to lift it.

Hacking up The Boardr Ledge - Done

And it's off.

Hacking up The Boardr Ledge - 50-50

Porpe with the 50-50 tester.

Hacking up The Boardr Ledge - Tailslide

Dylan feeling it out with a tailslide.

Hacking up The Boardr Ledge - Crooked Grind

One last crooked grind and this thing is now gone.

Related Results

There are no related results for this post.

Related Articles

Sessions on The Boardr Ledge

Sessions on The Boardr Ledge

10/10/2014

I'll be stacking sequences and photos on a regular basis here from sessions going down on The Boardr ledge. Thanks for stopping by, y'all!

Obstacle Number One in The Boardr TF: A Ledge and Manny Pad

Obstacle Number One in The Boardr TF: A Ledge and Manny Pad

5/12/2014

HiDefJoe has an edit from the first session and I've got a few construction photos from our first obstacle built in The Boardr TF. Thanks Jason Ranft for the manual labor. Zumiez also threw in on this one, so thanks to them for our first step towards an unempty warehouse.

The Boardr Logo

© 2024 The Boardr LLC, 4611 North Hale Avenue, Tampa, Florida 33614

TwitterYouTubeInstagram