Obstacle Number One in The Boardr TF: A Ledge and Manny Pad Blog Post at The Boardr

The Boardr Logo

Obstacle Number One in The Boardr TF: A Ledge and Manny Pad

Published 5/12/2014 by Rob Meronek

HiDefJoe has an edit from the first session and I've got a few construction photos from our first obstacle built in The Boardr TF. Thanks Jason Ranft for the manual labor. Zumiez also threw in on this one, so thanks to them for our first step towards an unempty warehouse.

Photos

The Boardr TF Ledge Construction Small Talk

It all starts with some small talk on the job site.

The Boardr TF Ledge Construction Supplies

Yeah ho.

The Boardr TF Ledge Construction Box Base

It could be a bed or a ledge box.

The Boardr TF Ledge Construction Jason Ranft

Gitter dunn, Jason Ranft.

The Boardr TF Ledge Construction Rebar

Rebar keeps the concrete from cracking, or something like that.

The Boardr TF Ledge Construction Sparks

Your standard issue construction photo with sparks flying.

The Boardr TF Ledge Construction Concrete Truck In

That's the same concrete truck that was a the Dream Driveway recently. It barely fit through the door.

The Boardr TF Ledge Construction Concrete Truck Rain

Today was one of the heaviest rain days in a long time. Good thing this pour is indoors.

The Boardr TF Ledge Construction Concrete Pour

Pour some concrete out for the homies.

The Boardr TF Ledge Construction Concrete Smooth Out

Rock a 2x4 back and forth to flatten out the concrete pile.

The Boardr TF Ledge Construction Concrete Banana Man

That one dude from the Slap message boards.

The Boardr TF Ledge Construction Concrete Icing

Like icing on a cake.

The Boardr TF Ledge Construction Justin Finishing

Justin's got the finishing stain to match The Boardr Store.

The Boardr TF Ledge Construction First Session

And new it's ready to rip. Check HiDefJoe's footage here.

Related Results

There are no related results for this post.

Related Articles

An Official Bid'niss Milestone for The Boardr

An Official Bid'niss Milestone for The Boardr

11/19/2013

It's been a fun few months of building a company from scratch. Today, we set an accounting formality and officially started The Boardr payroll. The first four employees are Ryan Clements, Jorge Angel aka Porpe, Bob Freeman, and Rob Meronek behind the lens here. I wonder how long this is going to last? I would guess 2013 to infinity. Thank you for the support, thanks skateboarding for everything else, and here's to 2014! That other document Ryan is holding is another piece of important sentiment for us that I'll address in another post. I just wanted to have it in this memorable photo and early milestone.

Another Milestone at The Boardr: TF Construction Begins

Another Milestone at The Boardr: TF Construction Begins

4/30/2014

Now that we've got some time to stop and breathe from having one big event behind us (NYC) and another one just about complete (Vegas), we can finally start dedicating some attention to the homefront. Yep, it's another baby milestone for us here at The Boardr. Today starts construction on our TF! We're going slow and calculated as usual with this project, too. I don't know my physical construction tools very well, but I do know there are some things in this photo that indicate concrete. Damnnnn, it's on. Feels like we're finally getting furniture in an empty home. Right now all I have for you is this one single photo.

Another Milestone: We Shipped Our First Little Stack of Orders Today

Another Milestone: We Shipped Our First Little Stack of Orders Today

2/4/2014

Inventory's in and stuff's online now. We ended our first weekend of being digitally open with a few orders for The Boardr T Shirt and some other random stuff. It was a memorable day for us. I'm just documenting it with a few quick snaps. This milestone seems like it has caused the work to just get started. Good thing it's mostly skateboarding work because that's a pretty good time. If your name was in that pile, thanks for the support.

More Milestones at The Boardr: Course Planning Begins and Our First Retail Customers' Support

More Milestones at The Boardr: Course Planning Begins and Our First Retail Customers' Support

2/13/2014

There's so much going on here from events planning to systems work to physical buildout to financial stuff to skate park ideas that I can't even keep track of where I'm at and what I've documented. We're working smart and steady here still putting our 2014 together while I pause here for an update. Our tenants in the other half of our warehouse are now out so we can start figuring out what will work for our facility to play with our skateboards in.

Two Milestones at The Boardr This Week

Two Milestones at The Boardr This Week

1/23/2014

A couple things happened this week that made it seem that much more real with all this skateboard bid'niss building we're doing around here. We got our first order of retail inventory in and our first online registration dollar hit the account.

The Boardr Headquarters: First Shovel in the Dirt

The Boardr Headquarters: First Shovel in the Dirt

12/18/2013

Before construction, there must be destruction. After closing on our building last week, we're making progress on The Boardr Headquarters as you can see in these photos by Justin Ryan.

A Session with OC Ramps at The Boardr Headquarters

A Session with OC Ramps at The Boardr Headquarters

7/24/2014

OC Ramps sent a box of skateboard obstacles our way, so we phoned the homies and put them to use in our empty space. We're working on filling it up more after a busy summer of events wraps up.

Sessions on The Boardr Ledge

Sessions on The Boardr Ledge

10/10/2014

I'll be stacking sequences and photos on a regular basis here from sessions going down on The Boardr ledge. Thanks for stopping by, y'all!

Friday at The Boardr HQ

Friday at The Boardr HQ

8/27/2016

Our indoor, private facility in Tampa is wide open for free skating for the public on weekdays from noon to 5pm. Stop by and join us. Here are a few snaps from The Boardr Staff Photographer, Chaz Miley.

Chopping Up The Boardr Ledge

Chopping Up The Boardr Ledge

8/7/2020

This ledge was the first thing we put in our warehouse back in 2014. Today we hacked it up to change things up a bit.

The Boardr Logo

© 2024 The Boardr LLC, 4611 North Hale Avenue, Tampa, Florida 33614

TwitterYouTubeInstagram